The inspection before start-up includes mechanical filter, mechanical suspension beam, various components connected to the rice milling machine, etc. The detailed inspection contents are as follows: the filter suspension should be flat to ensure the vertical suspension of the boom, the tightness is uniform, and the wire rope is slack; The suspension beam should be stable; free tools, personnel or other objects above the screen body and the transmission steel cavity; the transmission part can be freely rotated, the bearing must be lubricated; check all bolts, screws, nuts are installed and tightened; all machine covers, The machine door and side seals must be tightened in the correct position and in accordance with the regulations; the feed tube is installed to remain relaxed and not to be distorted.


Before the start of the rice mill, it is necessary to check the correct connection of the electrical parts, and use the vibration table to determine the insulation strength to ensure no leakage, safe and reliable. The direction of rotation of the motor should meet the requirements. Bind the rubber and cable and fix it on the inside of the transmission frame with the drive clamp. When connecting the user, check the connection and fixing. The cable is worn from the hole harness to the beam. Connect the fixed cable to the seat according to the installed wire clamp. On the boom below the chair, then secure it along the motor cable until the boom is connected to the power cord.
사용 후 세척 부분은 주로 예비 세척과 템퍼링의 네 단계로 구성되며, 보통 세 개의 선별기, 두 개의 세척기, 두 개의 왁싱기, 하나의 선택기, 세 개의 흡입기, 세 개의 자기 분리기를 사용합니다. 두 개의 급수기를 통해 폐기물 함량을 0.08% 이하로 낮춥니다.
일반적인 세척 부분의 과정은: 디스케일러 – 중력 먼지 수집기 – 밀기울 저장 진동기 – 자기 분리기 – 세척기 – 회전 체질 – 중력 제습기 – 등급별 자동 제습기 – 회전 체질기 – 분무수 가공기.